STORAGE TANK SERVICES
*Confirm existence of ASME code date plate.
*Strip to bare tank and prime vessel, saddles, and skid.
*Replace existing evaporator coil with efficient distributor coil.
*Re-insulate using 4" urethane insulation with aluminum jacket.
*Re-pipe using Sch. 80 seamless pipe and 2,000# (min) forged steel fittings.
*New stainless steel ball valves (1ea. LF, VB, LP, VP)
*New CGA fittings with hose blow-down valves.
*New dual ASME approved spring loaded safeties
*New dual bleeders (single on small tanks)
*New Copeland R-404A condensing unit with new line components.
*New Cutler Hammer control panel with fused disconnect.
*New 6" 0 to 600 psi pressure gauge.
*New Barton or Wika differential pressure indicator
*New control cabinet with lockable access door.
*Complete check out with all controls set for proper operation.