Carbo Tech, Inc.
Celebrating 23 Years in Business
 Toll Free 1-877-267-9821
 PH: 770-267-8821 F: 770-267-7286

 STATIC RECEIVERS  DOT RECEIVERS  PORTABLE RECEIVERS   VAPORIZERS 

USED EQUIPMENT LIST
UPDATED 2-20-2012
CURRENT DELIVERY IS ESTIMATED AT 12-14 WEEKS ARO


REHABBED 6 TON LEG MOUNTED CO2 RECEIVER

Includes: clean and inspect internally, remove sheet metal from sides, check and repair insulation as needed, recover sides with prepainted white aluminum sheets, repaint heads and leg supports, install new 1.5 HP Copeland R-404A refrigeration unit with all new refrigeration line components. Cutler Hammer electrical panel with fused disconnect, motor starter, control voltage transformer, Allen Bradley pressure switch and all other components necessary for automatic operation, new single bleeder, new dual ASME safeties (sized for outdoor installation), new Jamesbury (Eliminator) stainless steel ball valves installed on one each 1” vapor balance and 1.5” liquid fill lines (w/new CGA fittings and 1/2" hose blow-down valves), 1” vapor and 1” liquid process lines and three ½” instrument isolation valves, rebuilt Barton liquid level indicator, new 6" 0-600 psi pressure indicator, fabricate small cover over the refrigeration unit and complete check out with all controls set for proper operation.
Vessel Serial Number #19321 (516 steel)
    

REHABBED 13 TON CARDOX

Includes: Clean and inspect internally, check insulation, cover sides using pre-painted white aluminum sheets with a new carbon steel bottom section, repaint front and rear heads, install new 2 HP Copeland R-404A refrigeration unit with all new refrigeration line components, Cutler Hammer electrical panel with fused disconnect, motor starter, control voltage transformer, Allen Bradley pressure switch and all other components necessary for automatic operation, new dual bleeders, new dual ASME safeties (sized for outdoor installation), new Jamesbury (Eliminator) stainless steel ball valves on one each 1" vapor balance and 1.5" liquid fill lines (w/new CGA fittings and hose blow-down valves), 1" vapor and 1" liquid process lines and three 1/2" instrument isolation valves, rebuilt Barton liquid level indicator and new 6" 0-600 psi pressure indicator.  Complete check out with all controls set for proper operation. 
National Board #43974 (515 steel)
 

REHABBED 14 TON SKID MOUNTED CO2 RECEIVERS

Includes: Clean and inspect internally, remove sheet metal from sides, check and repair insulation as needed, recover sides with pre-painted white aluminum sheets, repaint heads, install new 2 HP Copeland R-404A refrigeration unit with all refrigeration new line components, Cutler Hammer electrical panel with fused disconnect, motor starter, control voltage transformer, Allen Bradley pressure switch and all other components necessary for automatic operation, new dual bleeder, new dual ASME safeties (sized for outdoor installation), new Jamesbury (Eliminator) stainless steel ball ball valves installed on 1 each vapor 1" vapor balance and 1.5" liquid fill lines (w/new CGA fittings and 1/2" hose blow down valves), 1" vapor and 1" liquid process lines and 3 1/2" instrument isolation valves, rebuilt Barton liquid level indicator, new 6" 0-600 psi pressure indicator, recover control cabinet frame with prepainted white aluminum sheets with new stainless steel hinge and lockable door.  Complete check out with all controls set for proper operation.
National Board #11 (612 steel) #3661 (612 steel) #10871 (515 steel) In addition refurbished 12 ton skid mounted CO2 Receiver -  NB#645 (212 steel)
 

REHABBED 50 ton horizontal CO2 receiver
BUILT BY LUBBOCK FOR LIQUID CARBONIC

Price Includes: Clean and inspect internally, remove sheet metal from sides, check and repair insulation as needed, recover sides with prepainted white aluminum sheets, repaint heads, new modular 6HP Copeland R404A refrigeration unit with all new line components, Cutler Hammer electrical panel with fused disconnect, motor starter, control voltage transformer, Allen Bradley pressure switch and all other components necessary for automatic operation, new dual bleeders, new dual ASME safeties (sized for outdoor installation), new Jamesbury (Eliminator) stainless steel ball valves installed on 1" each vapor balance and 1.5" liquid fill lines w/CGA fittings and 1/2" hose blow-down valves, and 1" vapor and 1" liquid process lines and three 1/2" instrument isolation valves, rebuilt existing Barton liquid level indicator, new 6" 0-600 psi pressure indicator. Complete check out with all controls set for proper operation. NOTE: 280PSI MAWP
National Board #2040 (515 steel)

NOTE: The price includes testing the refrigeration system, instruments and all valves with liquid carbon dioxide in the vessel for a minimum of 48 hours.  After testing, the refrigeration charge (R-404A) will be pumped into the reservoir and sealed off.  The lines will be cut and capped for shipment.  Connecting the system on site will be done by others and requires connecting all lines, pulling a vacuum on all lines, opening the service valves to release the charge, monitoring the system during the first few cycles to insure everything is running perfectly.  Some fine tuning may be required as actual conditions may differ from test conditions.  If this work is not done properly it could result in problems that are beyond our control.  Therefore, it should only be performed by a qualified refrigeration technician.

 

Rehabbed 50 ton skid mounted CO2 receivers

Price includes: Clean and inspect internally, remove sheet metal from sides, check and repair insulation as needed, re-cover sides with pre-painted white aluminum sheets, repaint heads, install new 6 HP Copeland R-404A refrigeration unit with all new refrigeration line components, Cutler Hammer electrical panel with fused disconnect, motor starter, control voltage transformer, Allen Bradley pressure switch and all other components necessary for automatic operation, new dual bleeders, new dual ASME safeties (sized for outdoor installation, new Jamesbury "Eliminator" stainless steel ball valves installed on one each 1" vapor balance and 1.5" liquid fill lines w/new CGA fittings and 1/2" hose blow down valves, 1" vapor and 1" liquid process and 3 ea. 1/2" instrument isolation valves, rebuilt Barton liquid level indicator, new 6" 0-600 PSI pressure indicator, recover control cabinet frame with prepainted white aluminum sheets with new stainless steel hinge and lockable door.  Complete check out with all controls set for proper operation.

NB: 30 (612 steel) and NB: 13057 (516 steel)

 

PLEASE NOTE: Pictures show basic style of receivers offered.  Actual receivers may vary slightly in appearance. All receivers tested before shipment with all controls set for proper operation.  Vaporizers not included unless noted, but are available.  All receivers are FOB Monroe, GA. and are subject to prior sale and availability.  Data reports normally available upon request. 
 

  Static Receivers    Home Page  

   geninformationatcarbotech.com